Work to develop the external engineering and transport infrastructure of a school designed for 2,000 students has been completed in the Uly Dala neighbourhood of Taraz.
The school is already operating, and children are studying there.
The school in the Uly Dala neighbourhood is already operating and children are studying there.
Work on the external engineering and transport infrastructure of a school designed for 2,000 students has been completed in Taraz. The school is already operating.
Source: Taraz City Administration
Work to develop the external engineering and transport infrastructure of a school designed for 2,000 students has been completed in the Uly Dala neighbourhood of Taraz.
The school is already operating, and children are studying there.
Translated from Russian using artificial intelligence. Source: Taraz City Administration
iPhone and iPad (Safari)