Skip to content
Advertisement
www.nomascom.kz upper
Tribuna.kz

Economy

Road repairs completed between Izimbet and Emba in Aktobe Region

The 40-kilometre section has been reopened to traffic after medium repairs.

Medium repairs have been completed on 40 kilometres of road between Izimbet village and the city of Emba in Aktobe Region. The route is being upgraded in stages.

Author: Робот Source: Akimat of Aktobe Region, Kazakhstan

Newly repaired asphalt road in Aktobe Region
The repaired road between Izimbet village and Emba in Aktobe Region. Illustrative photo. Photo: Larisa-K / Pixabay, Pixabay Content License

Medium repairs have been completed on 40 kilometres of road between Izimbet village and the city of Emba in Aktobe Region. The upgraded section is open to traffic.

The road had long drawn complaints from local residents and drivers. Damaged pavement and numerous potholes had made travel difficult.

The KZ04-02 Kandyagash–Emba–Shalkar–Irgiz highway, which has republican status, was built in 1960–1970. It is 401 kilometres long.

Advertisement
www.toishy.com

Upgrades to the route are being carried out in stages. Last year, the section from Kandyagash to Izimbet village was repaired.

From 2023 to 2025, medium repairs covered 155 kilometres of the highway: 10 kilometres in Irgiz District, 95 kilometres between Kotyrtas village and Shalkar, and 50 kilometres from Kandyagash to Izimbet.

Translated from Russian using artificial intelligence. Source: Akimat of Aktobe Region, Kazakhstan

Countries:
Tags:

Read also

Advertisement
Nomascom banner footer